About Us

History continued . . .                                                                          Page 1                                 Page 2

Two hundred and twenty miles of lines were constructed and energized in April 1940 with 446 members being served at the time. The average monthly consumption per consumer was 42 kWh at an average cost of 6.2¢ per kWh.

The Board approved the purchase of a service truck with a maintenance body and R. Hunter Bryan was hired as the first lineman. The first bills were mailed in April of 1940. The minimum bill was $1.00 for 10 kWh. The average monthly consumption per consumer was 42 kWh at an average cost of 6.2¢ per kWh. In May of 1940 a 10% penalty as added to bills not paid within 10 days. On October 8, 1940, Board Secretary Paul J. Jones resigned from the Board of Directors to become Manager of the Corporation replacing George C. Ingram who had been serving as project superintendent. Due to failing health, Ingram was compelled to give up his position as project superintendent and was elected to the Board of Directors.

During the next four years, most all of the members in all the area between the Oconee River and the Ocmulgee River had been signed up for electricity.

Even with this rapid growth, new challenges and problems had to be faced in this decade. Four applications for REA loans were submitted and approved but no construction could get underway because of the war period.

Wire stringing and pole setting almost came to a halt as America geared herself to winning a war after the Pearl Harbor attack on December 7, 1941. On December 24, 1941, the construction of 230 miles of lines were completed and energized with 767 members being served. The average monthly consumption per consumer was 44 kWh at 6.4¢ kWh.

By mid 1942, most of the men in the area had gone to war, leaving a small nucleus to operate the system and erect a few lines to isolated patches of the service area. Despite their limitations, the movement to electrify the area did not die during these difficult years. Those left at home just worked a little harder and many women volunteered their time to promoting the movement.

Finally in 1945, with the Normandy invasion on D-Day, hope began to soar . . . American boys would soon be coming home. America, as well as Oconee EMC, saw a new ray of sunshine.

With the war over, rural Americans resumed the effort to electrify the nation's farming regions. In all the forsaken placed where people were still without power, Oconee EMC continued its dream.

Today, Oconee EMC continues to serve electricity to over 8,000 members with 12,431 meters and maintains 1,904 miles of energized line.

 

 